c

Construction of the Maria Curie – Skłodowska North Bridge Route

  • the bridge
  • the bridge
  • the bridge

Within the investment Skanska realized 1-km section of the North Bridge Route from Pułkowa junction to Młociny exchange junction.

Realization of the project involved construction of two four-lane main roadways of the route and four single-span overpasses above the Encyklopedyczna street in Warsaw.  Skanska also realized a 400-meter section of the Encyklopedyczna street with a new driveway to tramway depot, a crossing with the Zgrupowania AK Kampinos street and an underpass beneath roadways of the main route.

Scope of works included construction of a 175 m long, two-lane Nocznickiego street , reconstruction of tramway route, construction of sidewalks, inclined planes, stairs, bus and tramway stops, walkways and bicycle routes of total length of 2 km. Skanska also realized new tramway contact line as well as new power grid and reconstructed gas pipeline, storm water drainage and sanitary sewerage systems.

Search or filter all our projects

Results

loading