c

Bypass in Grodziec Śląski

  • Bypass in Grodziec Śląski
  • Bypass in Grodziec Śląski
  • Bypass in Grodziec Śląski

In the years 2004 - 2005 Skanska realized bypass of Grodziec which was almost 5 km inlength. Skanska's scope of work included construction of 2 two-lane roadways of nearly 4,9 km in length that meet expressway standards, i.e. roadway width – 10 m, pavement bearing capacity - 115 kN per axle; roadways separated by a green belt and protection barriers.                                                                                                                                        The bypass is a part of the project “Construction of S-1 expressway between Bielsko-Biała, Skoczów and Cieszyn”. Realization works were started in 2002 and included construction of an expressway of total length 28,2 km alongside the existing state road No 1 from Bielsko - Biała to Cieszyn. The route is a part of Transeuropean Netowork of Corridor No VI, connecting north and south Poland and running from the Baltic sea through Łódź and Katowice to the Czech Republic border.

Search or filter all our projects

Results

loading