c

Flood protection facility for Młynówka, Opole

The project in figures

  • piles, diameter 400 ÷ 100 mm - 367 linear meters
  • Jet grouting piles, diameter 500 ÷ 1000 mm - 1499 linear meters
  • earth works - 355 240 m3
  • deepening, aggradate mud removal - 60 067 m3
  • sheet piling G62 - 800 t
  • structural steel - 709 t

Search or filter all our projects

Results

loading