c

Modernization of Stary Port pumping station and wastewater transfering system

The project in figures

  • 3300 m³/h - capacity of the new wastewater pumping station
  • 260 m - length of each of pipelines under the bottom of the Odra river

Search or filter all our projects

Results

loading