c

District of Columbia Water and Sewer Authority, New Headquarters Building

Sustainability and green

This project is targeting LEED Platinum certification.
The facility will include a heat recovery system utilizing the Pumping Station’s sewage waste stream as a heat source for the high-performance HVAC system, which is optimized for the heat recovery system output.

The project’s Energy Usage Intensity (EUI) design is initially targeting 23 Btu/square foot/year, well below conventional office buildings in the Washington, DC area. 100 percent of rainfall will be recovered onsite and utilized for non-potable usage – gray water use – in the Headquarters building. The entire DC Water campus landscape is being designed with native and naturalized species, selected for suitability to replace shoreline features with a natural water’s edge setting.

All building and site features are being designed to be low-to-no maintenance, easy to control, and durable. Our design-build team is working closely with DC Water to define commerciallyrecognized, valid strategies and technologies with readily available construction solutions for all aspects of the building and surrounding campus.

Search or filter all our projects

Results

loading