Constructing the project
Scope of realization of the Sports and Recreation Center in Zielona Góra included design preparation and execution of construction and assembly works of a new object with reinforced concrete structure and a basement together with water, sewerage, central heating and power supply connections. Scope of works covered also realization of the following installations: sanitary sewerage system, ventilation and air-conditioning systems, swimming-pool water treatment technology as well as electrical supply systems and low-voltage installations. The swimming-pool hall is a three-storey building including two overground and one underground storey with structure made of reinforced concrete poles topped with a roof built up on a steel framework structure. The main structure of the two-storey sports hall is made of reinforced concrete pole system and steel girders with a mezzanine covered with an ellipsoidal roof. Wellness & SPA section is a two-storey building realized according to traditional engineering technology and is functionally connected with the aquapark.
The project in figures
total cubic capacity of all objects: 176,000 cubic meters, usable area: 23,000 square meters